REFERENCES<
>
OBJECTIVES<
>
CTM BONUS
<
> <
>
January – July 2010
<
<
>
Complete overhaul of the postproduction units and unification with everyone sharing the same server for Sports ingest, the rushs, and programs with:
- A guaranty of the workflow for the sports programs, tailers….
- The installation of a ingest site and a completely unified postproduction unit
<
>
- Delivery and technical hand-over done on time = Objective 100% delivered
- CTM’s complete knowledge of the Avid ISIS 7000, Avid Interplay, Server Technology, Media asset Management
- CTM’s supervision of the management and transfer of the existing META files to the new location
<
> <
>
March – April 2010
<
<
>
Implantation of a new reporters-journalist wing based on Apple editing configurations with: Media asset Management with SPARX from New Insight
- Shared storage (Apple Xsan)
- Centralized ingest with Pipeline
- Media asset Management with SPARX from New Insight
<
>
- The Project’s specifications were respected technically and brought to reality under the initial budgetting amount
- CTM provided the bonus of a primary technical support level by email
- CTM helped build a shared network broadcasting driven by automation software
<
> <
>
July – September 2010<
>
Upgrade of the entire postproduction to work in the new HD formats (XDcam, P2,..):
- Simplification of the system by the introduction of a Media Asset Management, Avid Interplay
- A simplification of the entire system by a Media Asset Management system
<
>
- CTM provide a new solution that provided for zero ‘down-time’ during maintenance of the Station
- CTM created non-linear tapeless workflow with Media Asset Management by Avid’s Interplay
- CTM designed ingest to playout workflow EVS
- CTM designed Interplay – Omneon workflow
- CTM designed Tektronix CER tapeless workflow
<
> <
>
August – September 2010
<
>
Updating and upgrading of a posproduction unit dating from 2005 that would permit be compatible with the new video formats (Xdcam, P2, …) with:
- A simplification of the entire system by a Media Asset Management system
- Installation of a archiving unit shared by all the operators
<
>
- CTM provide a new solution that provided for zero ‘down-time’ during maintenance of the Station
- CTM created non-linear tapeless workflow with Media Asset Management by Avid’s Interplay
- CTM provided the on-site training for all the new technoligies and software including Decko and Active Circle
<
> <
>
June 2009<
>
TF1 had decided to regroup 7 different production units into a new single organization in a new facility with centralized infrastructure with :
- Each production unit having its own specific workflow
- The installation of shared workflow between all of the units
<
>
- CTM took on board the supplying of all the equipment, the software development, and training of the personnel and their technical support team, and the writing of the technical procedures
- CTM has taken on the task of technical support for the entire site
<
> <
>
December 2009<
>
Upgrade to a Avid 7000
- Add storage to the existing Avid ISIS system
- Upgrade to ISIOS 2 and migration to 64 bit system
<
>
- CTM’s complete knowledge of the Avid ISIS 7000, Avid Interplay, Server Technology, Media asset Management
- CTM’s supervision of the management and transfer of the existing META files to the new location
- CTM supervised the intregration with the existing network
<
> <
>
CENTRE CINEMAT. MAROCAIN
2005 – 2010
<
2005 – 2010
<
>
A progressive modernization of the entire film developing production unit by Debrie Technologies
- Technical migration to the ability to handle digital format for their Post-Production
<
>
- CTM could provide a complete film to digital Post solution
- CTM designed and installed a fluid production workflow for them
- CTM has arranged for training to be done on a semi-annuel basis
- CTM has taken on the technical support and any future technical migrations
<
> <
> <
> <
>